Skip to content

GATE HOLD PROCEDURES

Instrument Procedures

All definitions
« Back to Glossary Index

Procedures at selected airports to hold aircraft at the gate or other ground location whenever departure delays exceed or are anticipated to exceed 15 minutes. The sequence for departure will be maintained in accordance with initial call-up unless modified by flow control restrictions. Pilots should monitor the ground control/clearance delivery frequency for engine start/taxi advisories or new proposed start/taxi time if the delay changes.

Source FAA Pilot/Controller Glossary · checked 2026-08-25

« Back to Glossary Index

Enjoying Define Aviation ad-free?

Chip in and ads disappear right away in this browser — cancel anytime, no account needed.

Secure checkout via Stripe — Apple Pay, Google Pay, and cards.